ENERGY SYSTEMS / PROBABILISTIC FORECASTING LOCAL LAB
FROM FORECAST TO FLEXIBILITY

Tomorrow’s prices.
Today’s decisions.

Compare a linear benchmark with quantile boosting.
Then put the forecasts to work in a constrained battery.

Choose a run or start a synthetic demo. Demonstration results are not market evidence.
Research readiness: exploratory. Original forecast publication evidence and a final untouched holdout remain unresolved.
Ready
—Mean across 10 / 50 / 90% quantiles
—Nominal target 80% · not a guarantee
—Share of perfect-foresight total for the evaluated period
—Original price scale · EUR/MWh
01 / PRICE DISTRIBUTION

A range, not a promise.

ActualLightGBM medianLEAR80% interval
Run an experiment to inspect its out-of-sample forecasts.
Axis timestamps end in Z = UTC. Delivery-day selections use Europe/Berlin; a local day can start on the previous UTC date.
02 / FORECAST QUALITY

Skill, measured.

No results yet.
The DM comparison uses matched daily absolute losses.
03 / STORAGE VALUE

Forecasts into euros.

Totals for the selected experiment

Battery comparisons appear here.

Battery assumptions load with the selected experiment.

04 / PHYSICAL DECISIONS

Charge. Hold. Discharge.

Choose a completed experiment.

Charging (+)Discharging (−)
Choose a completed run.
Stored energy appears here.
Separate axes: power in MW above; stored energy in MWh below. Z means UTC; the selected delivery day uses Europe/Berlin.
05 / COST & PHYSICAL SENSITIVITY

Test the assumptions behind the value.

One assumption changes at a time. Every policy is reoptimised using the same frozen forecasts and settled at actual prices. Perfect foresight uses the matching settings. These comparisons do not select a winning strategy.

Sensitivity results load with the selected experiment when available.

Costs are in EUR/MWh; capacity in MWh; efficiency is a fraction. Values exclude market impact, capital costs and unconfigured grid/tax charges.

06 / REPRODUCIBILITY

Know what the result means.

Trial accounting

Archive inventory is generated by research_audit.py; earlier unarchived research trials remain unknown.

Data available locally

Assumptions & limitations

  • No forecasts or battery results have been generated yet.
Experiment log
No active job.